After a stroke left one of the owners unable to access the first floor, we redesigned the ground floor to create an accessible home — without the costly garage conversion originally proposed.

The customer story

The Problem

Following a stroke, one of the owners could no longer access the first floor of her home. The immediate priority was therefore to create everything she needed for day-to-day living on the ground floor, while still creating a home that worked comfortably for both owners.

A design had already been prepared by a third-party architect. The proposed solution was to convert the existing garage into additional living accommodation, and we initially costed the project on that basis.

We were preparing to start construction when further pre-start investigations changed everything.

What We Discovered

Before beginning the structural work, we investigated the existing drainage and the alterations required to convert the garage properly.

The drains running beneath the garage weren't simply private domestic drainage. They formed part of the United Utilities network and were showing signs of damage. At the same time, further investigation into the existing structure revealed that converting the garage would require significantly more structural work than had originally been anticipated.

Together, those discoveries would have added approximately £30,000 to the original project cost.

Rather than simply presenting the owners with a much larger bill and continuing with the existing design, we stopped and reconsidered whether there was a better way to achieve what they actually needed.

What We Designed

Our first alternative was to replace the existing conservatory with a new rear extension. We developed the design and submitted it for planning, but because the property had already been substantially extended at first-floor level in the past, the proposal wasn't accepted by the council.

So we went back to the drawing board again, and asked a different question: how can we make the space already inside this house work differently?

The existing living room was reduced in size and converted into the new ground-floor bedroom. Several structural openings were then introduced through the rear of the property, allowing previously separate rooms to become one large open-plan living space.

Rather than demolishing the conservatory, we upgraded it with a solid insulated roof and triple glazing, significantly improving its thermal performance and allowing it to become part of the new open-plan accommodation.

The result achieved the fundamental objective — comfortable ground-floor living — without undertaking the problematic garage conversion.

The ground floor rethought within the existing house: a new bedroom and ensuite on the ground floor, walls taken down to open the kitchen and dining into one space, and the conservatory kept and opened up rather than replaced.

What We Built

The front living room became an accessible ground-floor bedroom.

At the rear of the property, structural alterations opened the existing rooms into a large, connected living environment, with the upgraded conservatory becoming part of that space rather than remaining a thermally separate addition.

Level-access flooring was installed through the property to make movement around the ground floor easier, while further works including the driveway were incorporated as the project developed.

The finished home allowed the owners to continue living together in the property, with the essential spaces now accessible on one level.

The new ground-floor bedroom, created from the former living room.

How It Improved the Way They Live

This project wasn't really about creating more space. It was about making an existing home usable again after circumstances had changed dramatically.

The new bedroom meant the first floor was no longer essential to everyday life. The open-plan arrangement made movement around the main living areas easier, while the upgraded conservatory allowed an existing part of the house to become useful throughout the year.

Most importantly, the design responded to the owners' lives rather than forcing their lives to fit around the existing house.

The rear rooms opened into one connected living space, easier to move around on one level.

How we got there

01

Understanding what really mattered

When the owners first came to us, there was already an architectural solution on the table. The garage would be converted to create the additional ground-floor accommodation required following the owner's stroke. Our initial role was therefore to cost and construct somebody else's design.

But the underlying requirement wasn't actually 'convert the garage'. It was to create a home in which both owners could continue living comfortably when one could no longer access the first floor.

That distinction eventually became fundamental to the project.

02

Investigating before we built

As we approached construction, we undertook further investigation into the structural alterations and existing drainage.

That work identified two significant issues. The drainage beneath the garage formed part of the United Utilities network and showed signs of damage, while the structural work required to properly convert the garage was considerably greater than originally anticipated.

Proceeding with the existing design would have added approximately £30,000 to the project. Finding that before undertaking the work gave us the opportunity to stop and reconsider the design rather than discovering the problem halfway through construction.

03

The first redesign

Our first response was to move the proposed accommodation away from the problematic garage. We designed a new extension to replace the existing rear conservatory, creating the additional accessible accommodation there instead.

However, the house had already been extended substantially at the rear at first-floor level, and the new proposal wasn't accepted by the local authority.

It would have been easy at that point to return to the original garage conversion. Instead, we reconsidered the entire ground floor.

04

Reimagining the existing house

The breakthrough came from recognising that the property already contained enough space. It simply wasn't arranged around the owners' new requirements.

We reduced the size of the existing living room and converted it into a ground-floor bedroom. At the rear, structural openings allowed the existing rooms to become one larger open-plan living space.

And rather than replacing the conservatory, we improved what was already there — introducing a solid roof and triple glazing so that it could perform thermally as part of the main living accommodation.

The design ultimately required less new space than either of the previous solutions. It required better use of the space that already existed.

The existing conservatory, kept and upgraded so it works as part of the main living space.
05

Designing to the budget

The original garage-conversion scheme had been budgeted at approximately £70,000. Once the drainage and structural issues were properly understood, achieving that design would have increased the likely cost to around £95,000–£100,000.

Following the redesign, the new scheme was developed and contracted at approximately £100,000.

During construction, the owners chose to expand the scope further, including works to the driveway and enhanced internal finishes such as level-access flooring throughout the property. The final account was approximately £125,000.

The important distinction is that the movement from the contract value wasn't simply an uncontrolled increase in the cost of delivering the same work. The scope evolved as the owners chose to incorporate further improvements into the completed home.

Original scheme
~£70,000
Garage conversion, as first budgeted
Same scheme, once investigated
~£95–100k
Drainage and structural issues
Redesigned contract
~£100,000
Final account
~£125,000
Includes driveway and level-access finishes the owners added
The new driveway, one of the improvements the owners chose to add during the build.
06

Build, finish & handover

Once the redesigned solution had been agreed, the OPB project team delivered the structural alterations, new ground-floor bedroom, open-plan living accommodation and conservatory improvements.

Level access and the additional finishing works were incorporated to create a ground floor that worked as one connected environment.

What began as a proposed garage conversion ultimately became a much broader rethink of how the owners could use their existing home.

The new kitchen at the heart of the reworked ground floor.
A walk-in shower room.

Gallery

Inside the finished home

Get in touch

Start with a conversation

Planning something similar? Tell us what isn’t working about your home and the design team will be in touch to arrange a conversation — no obligation.

Your details are held in line with UK GDPR and the Data Protection Act 2018. We’ll never pass them on to any other organisation. By sending this you agree to our terms & conditions and privacy policy.